National Project for Potable Water Covering 240 Villages
Egypt
In Egypt, a national project related to the extension of potable water coverage area has been under progress. It was a project called "The National Project for 240 Villages" aiming at increasing potable water supply coverage from 95 % to 100 % by implementing the potable water coverage for 240 villages deprived from potable water.
The total project cost is 2 billion Egyptian Pounds (approximately 360 million US Dollars), partially financed by the Arab Fund for Economic and Social Development and the rest by Investment Bank.
Distributor of Tsurumi in Egypt, supplied over 360 units of pumps for this project:
Products
Pumps with Channel Impeller | Model : B 100B42.2 [ 60 units ] Model : BZ 100BZ47.5 [ 27 units ] |
---|---|
Pumps with Vortex Impeller | Model : U 40UA2.25 [ 40 units ] |
Vertical Stainless Steel Multistage Pumps | Model : TVM TVM2-180 [ 235 units ] |