National Project for Potable Water Covering 240 Villages

Egypt

In Egypt, a national project related to the extension of potable water coverage area has been under progress. It was a project called "The National Project for 240 Villages" aiming at increasing potable water supply coverage from 95 % to 100 % by implementing the potable water coverage for 240 villages deprived from potable water.

The total project cost is 2 billion Egyptian Pounds (approximately 360 million US Dollars), partially financed by the Arab Fund for Economic and Social Development and the rest by Investment Bank.

Distributor of Tsurumi in Egypt, supplied over 360 units of pumps for this project:

Products

Pumps with Channel Impeller Model : B
100B42.2 [ 60 units ]

Model : BZ
100BZ47.5 [ 27 units ]
Pumps with Vortex Impeller Model : U
40UA2.25 [ 40 units ]
Vertical Stainless Steel Multistage Pumps Model : TVM
TVM2-180 [ 235 units ]